EG Ehitus

Balticconnector Kiili - Paldiski

Construction period: April 2018
Client: Elering AS
Asukoht: Paldiski

EG Ehitus is the leading partner of the consortium of EG Ehitus, Scanweld and Alvora constructing the mainland part of the Balticconnector gas pipeline between Estonia and Finland. During the past few decades Balticconnector is the biggest pipeline project in Estonia that will pass almost 250 landowner premises and 5 local governments between Paldiski and Kiili. The construction will also cross with different communications as highways, rivers and railways. The length of the Balticconnecter on the land is 55 km and all together there will be almost 6000 welding jobs that will require extreme accuracy and quality. See more…

Rakvere VP Center sv Karja-Piiri, Võidu, Parkali-Jakobsoni Street pipeline reconstraction

Construction period: December 2017 – August 2018
Client: Rakvere Soojus AS
Location: Rakvere

district heat networkehitustööd Räpina highway in Võru

Construction period: July 2018-
Client: Danpower Eesti AS
Location: Võru

Jõgeva Rohu Street 10 heating pipelines constrction in Jõgeva Rohu Street 10

Construction period: July 2018 –
Client: AS Utilitas Eesti
Location: Jõgeva

Construction of pressurised gas filling station in Rakvere

Construction period: June 2018
Client: AS Eesti Gaas
Location: Rakvere

Construction of pressurised gas filling station in Jõhvi at Jaama 53A

Construction period: June 2018
Client: AS Eesti Gaas
Location: Jõhvi

Construction of pressurised gas filling station in

Viljandi at Planeedi street 11

Construction period: June 2018
Client: AS Eesti Gaas
Location: Viljandi

Construction of pressurised gas filling station at Tehnika Street 150, Tallinn

Construction period: September 2017 – December 2018
Client: AS Eesti Gaas
Location: Tallinn

Renovation of district heat pipelines in the city of Loksa

Construction period: August 2017 – …
Client: N.R. Energy OÜ
Location: Loksa

Construction of heat pipes at Lille- Rohelise Street , Pärnu

Construction period: June 2017- …
Client: Fortum Eesti AS
Location: Pärnu

Construction of heat pipes at Savi- Kirsi Street , Pärnu

Construction period: May 2017- …
Client: Fortum Eesti AS
Location: Pärnu

Construction of pressurised gas filling station in Pärnus at Savi Street 39


Tööde algus: May 2017 – August 2017
Client: AS Eesti Gaas
Location: Pärnu

Construction of water and sewerage pipes in Arvo Pärt Centre

Tööde algus: April 2017 – …
Client: AS Ehitustrust
Location: Laulasmaa

Design and construction of city of Paide’s district heat network Paide

Construction period: March 2017- …
Client: AS Paide Vesi
Location: Paide

Construction of pressurised gas filling station at Gaasi Street 5, Tallinn Tallinn

Construction period: February 2017- August 2017
Client: AS Eesti Gaas
Location: Tallinn

Construction of district heat pipelines in Vaska planning area

Construction period: February 2017- March 2017
Client: N.R. Energy OÜ
Location: Kiili

Renovation of district heat pipelines at Kalmistu Street 3 in the city of Tapa

Construction period: October 2016- December 2016
Client: N.R. Energy OÜ
Location: Tapa

50- 200 DN, trassi pikkus 163 jm.

Renovation of the district heat network on Kesk, Kajaka and Veski Street in Sillamäe

Construction period: October 2016- June 2017
Client: AS Sillamäe SEJ
Location: Sillamäe

Establishing gas pipeline on Suur-Ameerika 1, Tallinn Tallinn

Construction period: March 2016- June 2016
Client: AS Gaasivõrgud
Location: Tallinn

Construction of district heat network on Võidu Street in Rakvere

Construction period: July 2015- November 2015
Client: Lemmikäinen Eesti AS
Location: Rakvere

Construction of heating line to Hurda Street and Mammaste boiler plant

Construction period: July 2015- August 2015
Client: Põlva Soojus AS
Location: Põlva

Forelli 6, 8, 10, Renovation of Tallinn heating pipeline

Construction period: May 2015 – September 2015
Client: Tallinna Küte AS
Location: Tallinn

Water and sewerage pipeline in Keila-Joa

Construction period: December 2013 – September 2014
Client: Lahevesi AS
Location: Keila-Joa

Trassi pikkus ca 2 000 jm.

Construction of heat pipeline in the city of Kallaste

Construction period: August 2014 – September 2014
Client: Kallaste Linnavalitsus
Location: Kallaste

Trassi pikkus 285 jm.

Renovation of gas pipeline between Tartu – Rakvere

Construction period: 2014
Client: EG Võrguteenus AS
Location: Tartu maakond

D-kategooria DN500, trassi pikkus ca 800jm.

Heating pipeline in the city of Kehra

Construction period: June 2014 – August 2014
Client: Velko AV OÜ
Location: Kehra

District heating network, hamlet of Ardu

Construction period: August 2013 – August 2014
Client: Suhtasutus Kõue Varahaldus
Location: Ardu

District heating network, hamlet of Ardu

DN 50-114, line length 695 metres.

Riisipere district heating pipeline Riisipere

Construction period: May 2013 – May 2014
Client: Nissi Soojus AS
Location: Riisipere

Riisipere district heating pipeline

DN 32-150, line length 1,660 metres.

Construction of district heating network of the Vabriku boiler plant in the city of Türi

Construction period: May 2013 – May 2014
Client: Türi Linnavara OÜ
Location: Türi

Construction of district heating network of the Vabriku boiler plant in the city of Türi

DN 25-250, line length 4,021 metres.

Paljassaare road 8, Tallinn

Construction period: 2014
Client: Netaman Repair Group OÜ
Location: Tallinn

Construction of gas boiler plants (2 x 100 kW, 50 kW, 75 kW) and heating source units.

Raekoja plats 5, Tallinn

Construction period: 2014
Client: Amber Museum OÜ
Location: Tallinn

Construction of the internal gas supply for a restaurant.

Pidu and Harku street, Tallinn

Construction period: 2014
Client: Gaasivõrgud AS
Location: Tallinn

Project for developing category B distribution gas pipeline.

Heina street, Tallinn

Construction period: 2014
Client: Gaasivõrgud AS
Location: Tallinn

Project for renovating category A distribution gas pipeline.

Kärneri street 6, Tallinn

Construction period: 2014
Client: EnergiaProjekt OÜ
Location: Tallinn

Project for supply of gas to apartment building.

Pae street 36, Tallinn

Construction period: 2014
Client: WASH 24 OÜ
Location: Tallinn

Project to supply car wash with gas.

Gasification of Kartuli, Timuti, Rukki and Maisi Streets in the city of Tartu

Construction period: July 2013 – September 2013
Client: Gaasivõrgud AS
Location: Tartu

Gasification of Kartuli, Timuti, Rukki and Maisi Streets in the city of Tartu

DN 32-110, line length 1,230 metres.

Construction of gas pipeline for Ropka boiler plant in Tartu

Construction period: May 2013 – September 2013
Client: Anne Soojus AS
Location: Tartu

Construction of gas pipeline for Ropka boiler plant in Tartu

DN 273 (St) – approx. 205 metres.

Construction of district heating pipelines in the city of Kehra

Construction period: June 2013 – August 2013
Client: Velko AV OÜ
Location: Kehra

Construction of district heating pipelines in the city of Kehra

DN 50-200, line length 280 metres.

Renovation of district heat pipelines in the city of Rakvere

Construction period: June 2013 – August 2013
Client: Rakvere Soojus AS
Location: Rakvere

Renovation of district heat pipelines in the city of Rakvere

DN 40-200, line length 220 metres.

Relocation of the gas pipe on Tartu’s east bypass

Construction period: April 2013 – July 2013
Client: Nordecon AS
Location: Tartu

Relocation of the gas pipeline in the course of the construction of Ringtee in the city of Tartu.

DN 400 (St) – approx. 80 m; DN 110 (Pe) – approx. 420 m.

Construction of pre-insulated heat lines in Sompa

Construction period: September 2012 – May 2013
Client: VKG Soojus AS
Location: Sompa

Construction of pre-insulated heat lines in Sompa

DN 150, line length 320 metres.

Construction of pre-insulated heat lines in Kohtla-Järve

Construction period: August 2012 – May 2013
Client: VKG Soojus AS
Location: Kohtla-Järve

Construction of pre-insulated heat lines in Kohtla-Järve

DN 40-80, line length 420 metres.

Construction of category D gas pipeline in Kiisa

Construction period: May 2012 – May 2013
Client: EG Võrguteenus AS
Location: Kiisa

Construction of category D gas pipeline in Kiisa

DN500, line length approx. 7,300 metres.

Renovation of Tallinn Water Treatment Plant’s heating system

Construction period: 2013
Client: Tallinna Vesi AS
Location: Tallinn

Renovation of heating system of building A of Tallinn Water Treatment Plant (Järvevana Road 3), phases I and III

Water and sewerage pipeline in Pärnu-Jaagupi

Construction period: July 2013 – September 2013
Client: Mako AS
Location: Pärnu-Jaagupi

Phase 4 of construction on water and sewerage lines in Pärnu-Jaagupi (Männi Road).

Line length 630 metres.

Construction of Kiisa GJJs

Construction period: 2013
Client: EG Võrguteenus AS
Location: Kiisa

Construction of Kiisa gas distribution plant in Harju County

Natural gas filling station, Vinkli Street 2a, Tallinn

Construction period: 2013
Client: Eesti Gaas AS
Location: Tallinn

Tallinn’s second natural gas filling station was built in Mustamäe (Vinkli Street 2a).

Project for renovating gas pipeline in Loo Hamlet

Construction period: 2013
Client: EG Võrguteenus AS
Location: Loo alevik

Project for renovating gas pipeline for the use of Iru Power Plant on the territory of Loo Gas Distribution Plant (GJJ).

Telliskivi Street, Tallinn

Construction period: 2013
Client: EG Võrguteenus AS
Location: Tallinn

Project for renovating category A and B distribution gas pipeline.

Pronksi Street 6a, Tallinn

Construction period: 2013
Client: EnergiaProjekt OÜ
Location: Tallinn

Project for relocating cathode protection plant.

Peterburi Road 105, Maardu linn

Construction period: 2013
Client: Energia Projekt OÜ
Location: Maardu

Vopak E.O.S. Design of the gas and heating system for AS Trengate Terminal.

Viimsi Hamlet, Viimsi Municipality, gas pipeline project

Construction period: 2013
Client: EG Võrguteenus AS
Location: Viimsi

Design of the gas pipeline for Astilbe Road, Pojengi Road, Nelgi Road, Astri Road and Astri cross.

Construction of pre-insulated heat lines in Ahtme

Construction period: August 2012 – August 2013
Client: VKG Soojus AS
Location: Kohtla-Järve

Construction of pre-insulated heat lines in the Ahtme district of Kohtla-Järve.

DN 40-200, line length 2,946 metres.

Water and sewerage network for Astri shopping centre in Narva

Construction period: May 2013 – November 2013
Client: Nordecon AS
Location: Narva

Construction of water and sewerage network for Astri shopping centre in Narva.

Line length 1,040 metres.

Water and sewerage pipeline in the village of Järlepa

Construction period: February 2013 – June 2013
Client: Paide MEK AS
Location: Järlepa küla

Renovation of water and sewerage lines in the village of Järlepa in Rapla County.

Line length 2,420 metres.

Construction of heat lines in the city of Jõhvi

Construction period: August 2012 – October 2013
Client: VKG Soojus AS
Location: Jõhvi

Construction of heat lines for residential districts of the city of Jõhvi.

DN 20-100, line length 8,740 metres.

2012

Construction of the Kiili linevalve point

Construction period: 2012
Client: EG Võrguteenus AS
Location: Kiili

Construction of Kiili linevalve point in Harju County.


Installation of a gas CHP plant

Construction period: 2012
Client: Eesti Gaas AS
Location: Tallinn

Installation of a gas CHP plant at an office building on Liivalaia 9 in Tallinn

Possibility of establishing mini-CHP based on natural gas


Construction of heating network for Rakvere CHP plant

Construction period: January 2012 – August 2012
Client: ES Bioenergia AS
Location: Rakvere

Construction of heating network for Rakvere CHP plant.

DN 100-200, line length 600 metres.


Wismari Street, Tallinn gas pipeline renovation project

Construction period: 2012
Client: EG Võrguteenus AS
Location: Tallinn

Project for renovating category A and B distribution gas pipeline on Wismari Street in Tallinn.


Renovation and construction of district heat lines in Paide

Construction period: June 2011 – December 2012
Client: Paide Vesi AS
Location: Paide

DN 20 – 200, line length 2 753 meters.


Water and sewerage pipeline on Jõe Street in the city of Kehra

Construction period: August 2012 – November 2012
Client: Velko AV OÜ
Location: Kehra

Renovation and construction of the water and sewerage line on Jõe tänav in the city of Kehra, Harju County.

Line length 1,700 metres.


Water and sewerage pipeline in Ülejõe in the city of Kehra

Construction period: March 2012 – October 2012
Client: Velko AV OÜ
Location: Kehra

Renovation and construction of water and sewerage systems in the Ülejõe district of the city of Kehra, Harju County.

Line length 4,825 metres, 2 pumping stations.


Water and sewerage pipeline in the village of Anija

Construction period: September 2011 – November 2012
Client: Velko AV OÜ
Location: Anija

Renovation of water and sewerage lines in the village of Anija, Anija Rural Municipality in Harju County.

Line length 5,040 metres.


Water and sewerage pipeline in Alavere

Construction period: July 2011 – August 2012
Client: Velko AV OÜ
Location: Alavere

Renovation of water and sewerage lines in the village of Anija, Anija Rural Municipality in Harju County.

Line length 5,990 metres, 2 pumping stations.


Renovation of district heat pipelines in the city of Vaida

Construction period: April 2012 – November 2012
Client: Kukruse Maja OÜ
Location: Vaida alevik

Renovation of district heating network in Vaida Hamlet.

DN 32-200, line length 1,223 metres.


Renovation of Kukruse district heating lines

Construction period: April 2012 – October 2012
Client: Kukruse Maja OÜ
Location: Kukruse

Renovation of district heat lines in the Kukruse district of the city of Kohtla-Järve.

DN 25-125, line length 3,080 metres.


Renovation and construction heating network in city of Räpina

Construction period: August 2011 – September 2012
Client: Revekor AS
Location: Räpina

Renovation and construction of heating line in city of Räpina

DN 50-200, line length 3,600 metres


Renovation of Lähte insulation pipeline

Construction period: December 2011 – September 2012
Client: Rakvere Soojus AS
Location: Lähte

Renovation of the Lähte district heating pipeline.

DN 40-150, line length 1,753 metres


Renovation of district heating networks at Rakvere Hospital

Construction period: April 2012 – October 2012
Client: Rakvere Soojus AS
Location: Rakvere

Renovation of district heating networks at Rakvere Hospital.

DN 40-200, line length 664 metres.


Renovation of district heat pipelines on Ranna Street, in the city of Sillamäe

Construction period: April 2012 – July 2012
Client: Sillamäe SEJ AS
Location: Sillamäe

Phases I and II of renovation work on the pipeline along Ranna Street in the city of Sillamäe.

DN 400, line length 1,500 metres.


Vae Street 6, Laagri alevik, Saue vald

Construction period: 2012
Client: BTIsolatsioon OÜ
Location: Laagri alevik

Gas heater installation project.


Hoiu Street 3, Laagri Hamlet, Saue Rural Municipality

Construction period: 2012
Client: Sargo AS
Location: Laagri alevik

Design of gas supply for manufacturing facility in Laagri


Kopli Street 103, Tallinn

Construction period: 2012
Client: BLRT Grupp AS
Location: Tallinn

Designing category B gas pipeline on Kopli Street 103 in Tallinn.


Pärnu mnt. 141a, Tallinn

Construction period: 2012
Client: Raua Ehitus OÜ
Location: Tallinn

Design of gas supply within property lines for Hesburger fast food restaurant.


Lauliku Street 2/Pärnu mnt. 390b, Tallinn

Construction period: 2012
Client: EnergiaProjekt OÜ
Location: Tallinn

Design of gas supply for Maxima supermarket.


Pärnu mnt. 536b, Tallinn

Construction period: 2012
Client: EnergiaProjekt OÜ
Location: Tallinn

Design of gas supply for Selver supermarket in Pääsküla.


Tartu mnt. 50, Tallinn

Construction period: 2012
Client: Vana Willemi Kõrtsid OÜ
Location: Tallinn

Project for gas supply for kitchen equipment in Vana Willemi Pub.


Soo Street, Tallinn gas pipeline renovation project

Construction period: 2012
Client: EG Võrguteenus AS
Location: Tallinn

Project for renovating category A and B distribution gas pipeline on Soot n in Tallinn.


Paljassaare Road 8, Tallinn

Construction period: 2012
Client: Netaman Repair Groupp OÜ
Location: Tallinn

Project for gas supply for gas plasma cutting machine and gas boiler to be installed in manufacturing facility; Project for installation of convectors.


Water and sewerage pipeline in Aseri

Construction period: September 2010 – February 2012
Client: Nordecon Infra AS
Location: Aseri

Construction of public water supply and sewerage infrastructure in Aseri Hamlet, Rannu and Kõrtsialuse village in Ida-Viru County.

Line length 3,540 metres.

2011

Natural gas automotive filling station, Tähe Street 135E, Tartu

Construction period: 2011
Client: Eesti Gaas AS
Location: Tartu


Water and sewerage pipeline in the village of Voose

Construction period: September 2010 – May 2011
Client: Velko AV OÜ
Location: Voose küla

Renovation of water and sewerage systems in the village of Voose, Anija Rural Municipality in Harju County.

Line length 2,030 metres.


Connecting district heating network in city of Lihula

Construction period: September 2011 – November 2011
Client: Lihula Soojus OÜ
Location: Lihula

Phase 1 of renovating district heating network and establishing additional concoctions in the city of Lihula.

DN 32-100, line length 440 metres.


Construction of the main district heating line in Aseri Hamlet

Construction period: July 2011 – October 2011
Client: Aseri Kommunaal OÜ
Location: Aseri

Construction of district heating pipeline in Aseri Hamlet.

DN 250, line length 820 metres.


Connecting AS Rakvere Soojus heat utility’s Muru Street boiler plant

Construction period: July 2011 – November 2011
Client: Rakvere Soojus AS
Location: Rakvere

Connecting district heat pipeline with Muru Street boiler plant in Rakvere.

DN 15, line length 580 metres


Kiviõli heating pipeline

Construction period: august 2010 – november 2011
Client: Kiviõli Soojus AS
Location: Kiviõli

Renovation and construction of the heat pipeline and heat source units in the city of Kiviõli.

DN 250-300, line length 3,500 metres, 27 heat source units.


District heating network in the city of Türi

Construction period: June 2010 – May 2011
Client: Türi Linnavara OÜ
Location: Türi

Renovation of district heating network of the Tehnika boiler plant in the city of Türi.

DN 25-200, line length 3,363 metres.


Project for renovating the heat lines in the city of Paide

Construction period: 2011
Client: Paide Vesi AS
Location: Paide

Project for renovating the heat lines in the city of Paide


Katusepapi Street 6, Tallinn gas pipeline project

Construction period: 2011
Client: KS Kinnisvara AS
Location: Tallinn

Renovating category B gas pipeline on Katusepapi Street 6 in Tallinn.


Kauba Street, Tallinn gas pipeline development project

Construction period: 2011
Client: EG Võrguteenus AS
Location: Tallinn

Project for renovating category A and B distribution gas pipeline on Kauba Street in Tallinn.


Kopli Street 103, Tallinn

Construction period: 2011
Client: BLRT Grupp AS
Location: Tallinn

  • Project for gas supply to painting booth
  • Project for installing gas-powered heaters in blacksmith’s forge
  • Heating pipeline renovation project.

National road no.11 Tallinn roundabout

Construction period: 2011
Client: Tinter-Projekt OÜ
Location: Harjumaa

Solution for intersection with category D natural gas pipeline.


Heating pipeline renovation project in city of Kohtla-Järve

Construction period: 2011
Client: VKG Energia OÜ
Location: Harjumaa

Heating pipeline renovation project in Pioneeri Street – Järveküla Road, city of Kohtla-Järve


Construction of Põlva heating pipeline

Construction period: August 2010 – January 2011
Client: Põlva Soojus AS
Location: Põlva

Construction of heating pipeline in city of Põlva.

DN 50-80, line length 715 metres.

2010

Uuemõisa heating pipeline

Construction period: August 2010 – November 2010
Client: Uuemõisa Teenus AS
Location: Uuemõisa

Renovation and construction of district heat pipeline in the Haudejaama area of Uuemõisa.

DN 50-250, line length 1,685 metres.


Heating pipeline in the old part of Sillamäe

Construction period: July 2010 – November 2010
Client: Sillamäe
Location: Sillamäe SEJ AS

Renovation of heating pipeline in the old part of Sillamäe.

DN 25-100, line length 970 metres.


Kambja heating pipeline

Construction period: April 2010 – October 2010
Client: Cambi OÜ
Location: Kambja

Renovation of district heat pipelines in Kambja

DN 32-150, line length 1,638 metres.


Liivalaia 9, Tallinn

Construction period: 2010
Client: Eesti Gaas AS
Location: Tallinn

Project for reconnecting natural gas supply pipeline.


Tallinn, Narva mnt. E20 gas pipeline working project

Construction period: 2010
Client: Merko Ehitus AS
Location: Tallinn

Loo-Mardu B3 gas pipeline working project.


Basic project for heating pipeline in Kambja

Construction period: 2010
Client: Cambi OÜ
Location: Kambja

Main project for heating pipeline in Kambja.


Preliminary project for district heating pipeline in Ranna Street, Sillamäe

Construction period: 2010
Client: Sillamäe SEJ AS
Location: Sillamäe

Preliminary project for renovation of district heating pipeline in Ranna Street, Sillamäe.


Kohtla-Nõmme linevalve point

Construction period: Kohtla-Nõmme
Client: EG Võrguteenus AS
Location: 2010

Design of category D natural gas linevalve point in Lüganuse Rural Municipality, Kohtla-Nõmme.


Lumemarja Road, Haabneeme Hamlet, Viimsi

Construction period: 2010
Client: EG Võrguteenus AS
Location: Viimsi

Project for category A and B distribution gas pipeline on Lumemarja Road.

2009

Natural gas automotive filling station, Suur-Sõjamäe 56a, Tallinn

Construction period: 2009
Client: Eesti Gaas AS
Location: Tallinn

The first automotive natural gas filling station in Estonia was built in Tallinn, at Suur-Sõjamäe Road 56a.


Heating pipeline in Sillamäe beach zone

Construction period: July 2009 – October 2009
Client: Sillamäe SEJ AS
Location: Sillamäe

Heating pipeline in Sillamäe beach zone.

DN 400, line length 804 metres.

For the first time in Estonia, we used composite materials as a pipe bridge for spanning a river.


Construction of gas pipeline in Ahtme district, city of Jõhvi

Construction period: December 2008 – December 2009
Client: EG Võrguteenus AS
Location: Jõhvi

Construction of category C gas pipeline, phases I and II.

DN 300, line length 10.2 km.


Nõmme 9 area 2 water and sewerage pipeline

Construction period: May 2009 – October 2009
Client: Water Ser AS
Location: Tallinn

Renovation of water and sewerage systems in the Nõmme district of Tallinn.

Line length 2,000 metres.


Water and sewerage pipeline in Valjala

Construction period: May 2009 – July 2009
Client: Nordecon Infra AS
Location: Valjala vald

Construction of water and sewerage pipe in Valjala municipality, Saare County.

Line length: water pipeline 3,560 metres; sewerage pipeline 3,550 metres; 1 pumping station


Gas pipeline project in Pringi Village, Viimsi Municipality, gas pipeline project

Construction period: 2009
Client: EG Võrguteenus AS
Location: Pringi küla

Project for renovating category B distribution gas pipeline in Vanapere põik and Reinu Road.


Kopli 116, Tallinn

Construction period: 2009
Client: Tallinna Tehnika Ülikool
Location: Tallinn

Designing gas supply for boiler plant at Kopli Street 116 in Tallinn.


Ahtme mnt. 145, Kohtla-Järve

Construction period: 2009
Client: Ahtme Soojus AS
Location: Kohtla-Järve

Project for gas supply at Ahtme mnt 145, Kohtla-Järve.


Gas pipeline renovation project at Salme Street, Tallinn

Construction period: 2009
Client: EG Võrguteenus AS
Location: Tallinn

Project for renovating category A and B distribution gas pipeline on Salme Street in Tallinn.


Gas and heating project on Traani Road, Saku Rural Municipality, Saku Hamlet

Construction period: 2009
Client: Saku Läte OÜ
Location: Saku

Design of gas and heating project on Traani Road, Saku Rural Municipality, Saku Hamlet.


Bremeni käik 1, Tallinn

Construction period: 2009
Client: 1Partner Ehitus OÜ
Location: Tallinn

Project for gas supply to kitchen equipment of Chakra Restaurant.


Vardi village, Pärtsi municipality, Viljandii County, linevalve point

Construction period: 2009
Client: EG Võrguteenus AS
Location: Vardi küla

Category D natural gas linevalve point project in Viljandi.


Internal pipe at Radisti Road 7, Soodevahe village

Construction period: 2009
Client: Planeeringute Grupp OÜ
Location: Soodevahe küla

Design of water, sewerage, gas and heating pipeline at Radisti Road 7.

2008

Water and sewerage pipeline in Paldiski peacekeeping operations centre

Construction period: June 2008 – September 2008
Client: Facio Ehitus AS
Location: Paldiski

Renovation of water and sewerage lines at the Paldiski peacekeeping operations centre in Harju County.

Line length: water pipeline 3,550 metres; sewerage pipeline 100 metres; storm water sewerage 2,300 metres.


Water and sewerage pipeline at Keeru and Matka Road in Mähe, Tallinn

Construction period: May 2008 – July 2008
Client: ASPI AS
Location: Tallinn

Construction of water and sewerage pipeline at Keeru and Matka Road in Mähe, Pirita district of Tallinn

Line length 700 metres.


Laagri heating line

Construction period: April 2008 – September 2008
Client: Fortum Termest AS
Location: Jõhvi

Renovation of the Laagri heating line.

DN 125-50, line length 855 metres.


Construction of gas pipeline in Jõhvi Technology Park

Construction period: June 2008 – September 2008
Client: Fortum Termest AS
Location: Jõhvi

Construction of natural gas distribution pipeline in city of Jõhvi.

Line length 2.8 km.


Construction of gas pipeline in Southern Estonia

Construction period: March 2008 – August 2008
Client: EG Võrguteenus AS
Location: Lõuna-Eesti

Construction and renovation of category D gas pipeline.

DN 500, line length 700 metres.


Construction of Jõgeva – Põltsamaa gas line

Construction period: July 2007 – July 2008
Client: Eesti Gaas AS, Põltsamaa Vallavara OÜ, Fortum Termest AS
Location: Põltsamaa

Construction of category D gas pipeline.

DN 200, line length 32 km.


Männiku Street 16, city of Püssi, Ida-Viru County

Construction period: 2008
Client: MKT Holding OÜ
Location: Püssi

Project for external water and sewerage pipeline at fibreboard plant.


Gas and heating project at Salve Street 2C, Tallinn

Construction period: 2008
Client: Sirowa Tallinn AS
Location: Tallinn

Design of gas and heating system at Salve Street 2C.


Gas and heating project at Kastani 2, Tallinn

Construction period: 2008
Client: Küttemaailm OÜ
Location: Tallinn

Gas and heating project at Kastani 2, Tallinn.


Paljassaare Road 43E, Tallinn

Construction period: 2008
Client: Intermetalsteel OÜ
Location: Tallinn

Project for gas supply to gas-powered convectors and gas plasma cutting machines.


Gas and heating project at Maagi Street 7, Maardu

Construction period: 2008
Client: SG Metall Produktion OÜ
Location: Põltsamaa

Design of gas and heating system at Maagi Street 7.


Põltsamaa GRJ, Lustivere GRJ

Construction period: 2008
Client: Fortum Termest AS
Location: Põltsamaa

Design of the Põltsamaa and Lustivere gas regulation plants in Jõgeva County.

2007

Water, sewerage and gas pipelines on the Paekaare immovable property

Construction period: November 2006 – May 2007
Client: UBS AS
Location: Lubja küla

Construction of water, sewerage and gas pipelines on the Paekaare immovable property in the village of Lubja

Line length: water pipe 800 m; sewerage pipe 380 m; storm water pipeline 650 m; gas pipeline 2,223 m; 1 pumping station


Loo Technology Park

Construction period: March 2007 -July 2007
Client: Merko Ehitus AS
Location: Loo

Construction of Loo Technology Park heating network.


Tondi Street 55a category B gas distribution pipeline

Construction period: 2007
Client: Audentes Halduse OÜ
Location: Tallinn

Renovation of Category B gas distribution pipeline on Tondi Street 55a in Tallinn.


Project for installation of convectors at Saha Road 18, Loo Hamlet

Construction period: 2017
Client: Extra Invest OÜ
Location: Loo

Project for installation of convectors for gas heating.

2006

Construction of Tootsi – Kiisa gas pipeline

Construction period: December 2005 – November 2006
Client: Eesti Gaas AS
Location: Tootsi-Kiisa

Construction of category D gas pipeline.

DN 250, line length 14 km


Rääma – Raba

Construction period: March 2005 – December 2006
Client: Eesti Gaas AS
Location: Rääma

Construction of category D gas pipeline.

DN 500, line length 5 km

2005

Põllu – Kustase water and sewerage pipeline

Construction period: July 2005 – November 2005
Client: SRV Ballista AS
Location: Kustase

Construction of Põllu – Kustase water and sewerage pipeline.